WCC Replace Roofs R1 and R2

WCC Building R: a. As indicated on plans, remove existing roofing system to concrete deck. Install new roofing system and flashings. Remove internal roof drains; and build-up tapered insulation to slope deck to building perimeter. b. Install new gutters and galvanized downspouts to grade. c. Remove mechanical exhaust fans and curbs; and replace with new. d. Provide electrical as required to support work. e. Install new swing gate for fenced yard area.

Status

Accepting Bids

Bid Date6/4/20 2:45 pm

Company & Contacts

Cortner Architectural Company

Jim Cortner   (509) 363-1039

Location

Shelton, WA

Project Estimate: $1,900,000 to $2,100,000

Bidders may download electronic files for a nominal fee of $10.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A MANDATORY Pre-Bid onsite walk-through and conference is scheduled for 10:00 A.M., Thursday, May 28, 2020, at the rear west gate shack/sally port via service entrance, at Washington Corrections Center, 2321 W. Dayton Airport Road, Shelton, WA 98584, To be considered, prime bidders are required to attend.