East Valley School District Secure Entries

The Work includes is not limited to interior improvements and minor sitework. The building construction includes structural steel, steel and wood framing systems, interior finish carpentry, building insulation, fire stopping systems, joint sealants, steel doors and frames, flush wood doors, door hardware, aluminum-framed entrances and storefronts, glazing, gypsum board, acoustic panel ceilings, resilient base and accessories, resilient flooring, tile carpeting, interior and exterior painting, signage, miscellaneous specialties, roller window shades and minor site improvements as indicated on the Drawings and specified herein.

Status

Bidding Closed

Prebid Date5/13/20 10:00 am

Bid Date5/20/20 3:00 pm

Company & Contacts

Architects West, Inc

Ed Champagne edc@architectswest.com   (208) 667-9402

Location

Spokane Valley, WA

Project Estimate: $1,000,000.00

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section

A non-mandatory Pre-Bid Conference is scheduled for 10:00 a.m. on May 13, 2020, beginning at Trent Elementary at 3303 N. Pines Road, Spokane Valley, WA. This project consists of eight individual sites and site visits will be consecutive following Trent Elementary. In an effort to meet the new health and safety standards all who attend the walk will need to maintain social distancing guidelines at all times.