2020 Waterline Replacement

The Project consists of Replacing approximately 14,000 linear feet of potable water distribution mainline with new 6-inch, 8-inch, and 12-inch diameter pipeline. Work includes abandoning existing pipelines, reconnecting new mainline to the existing system, replacing existing and installing new valves, replacing and installing new fire hydrants, replacing existing meter boxes, and replacing potable water services from the new mainline to existing or new meter boxes.

Status

Bidding Closed

Prebid Date4/30/20 10:00 am

Bid Date5/13/20 2:00 pm

Company & Contacts

J-U-B Engineers

Ben Schmitt   (208) 660-8481

Location

Brewster, WA

Project Estimate: $3,500,000

Bidders may download electronic files for a fee of $10.00. Printed documents are available, at Bidders expense, by choosing the “Order” option.

April 30, 2020 10:00 am ZOOM Meeting Web Address: https://jubengineers.zoom.us/j/91165336443 Meeting ID#: 911 6533 6443