Electric City Lift Station Replacement Project

The project generally consists of demolition and replacement of the existing lift station with a new package lift station. One of the pumps in the existing lift station will be salvaged and used in the new lift station and the existing building will be preserved and control panels installed inside this building. The project will also include approximately 50 feet of 10-inch PVC gravity sewer main and 50 feet of 6-inch force main and associated work. In addition to replacement of the lift station this project will include installation of a new package backup generator.

Status

Bidding Closed

Prebid Date4/22/20 11:00 am

Bid Date5/1/20 10:00 am

Company & Contacts

Century West Engineering

Steve Nelson snelson@centurywest.com   (509) 838-3810

Location

Electric City, WA

Project Estimate: $300,000 – $375,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A phone in pre-bid conference will be held at 11:00 AM local time on April 22, 2020 by call in at the below number and access code:
Phone Number: 800-944-8766
Participant Code: 80433#